Show sidebar

ACI Provisions for Structural Design of Bored Piles

Lecture Given within Geo Virtual Platform on the date 29th Jan 2025.

Design Approach To Two Preliminary O-Cell Tests

The original requirement for preliminary piles testing was for verifying the pile lengths that have been given in the SI report (issued by the Lab).

CAST-IN-PLACE CONCRETE

The grades of concrete are shown on the Engineer’s General Notes
Drawings by reference to the 28-day characteristic cylindrical
compressive strength for various elements as given in the concrete
material schedule.